An independent developer of power-first AI campuses

The digital age starts somewhere physical.

Why we existWe believe the AI era should be built on ground that's ready for it: firm power, secured water, and alignment with the host community's needs.

Illustration of a phased AI campus beside a power plant and substation in a high-desert valley

Illustrative rendering

Why

Chips are scaling faster than the power they require.

Capacity that can't be energized can't earn. Progress shouldn't wait on the physical world, and closing the gap between planned compute and energized power is why GroundPoint exists.

PLANNED COMPUTE ENERGIZED POWER THE GAP

How

One project. Interdependent decisions.

Land, engineering, power, and capital can be acquired separately. Then, each component runs on its own schedule, with the slowest one setting the pace. GroundPoint plans them as one project, starting with the power.

Four principles guide every project: start from the ground up; partner with those who have it; one project, one schedule; gates before construction.

Each part of a campus sets the limits of the others. Select one to trace the upstream drivers and downstream impacts.

01020304 ONE PROJECTONE SCHEDULE PATH TOENERGIZED CAPACITY

Start with a credible energy position.

Gas, water, and pore space are assessed before the campus is designed so power is planned in, rather than waited on.

Decides
  • First-phase size and timing
  • Bridge and firm power
  • Water and carbon approach
Depends on
  • Resource owners and rights
  • Permits and interconnection
  • The customer's load profile

What

Power-first AI campuses, phased to a gigawatt and beyond.

For hyperscalers, neoclouds, and AI labs, from an independent, customer-neutral developer.

  • Powered shell to turnkey solutions

    Flexible deployment options ranging from permitted, powered building shells to fully fitted, move-in-ready data centers tailored to your IT specifications.

  • Phased to scale

    From hundreds of megawatts to multiple gigawatts, with all phases planned concurrently.

Flagship · in development

The first is in Wyoming.

The Wyoming campus is in development with Vero3.

The Wyoming campus site: open sagebrush high desert under a wide sky
The campus site · August 2026
500 MW
First phase target, behind the meter
2029
First large-scale power targeted, with bridge power before then
7.5 GW
Campus pathway, phased

Targets and Sponsor estimates.

Project team

Led from where energy meets hyperscale.

Founder-led, with an experienced project team on the ground in Wyoming. GroundPoint and Vero3 are developing the campus together, as one team.

Meet the project team
  • Eddie GanzinottiGroundPoint · Founder and Managing Partner
  • Tim McManusVero3 · Founder and Director
  • Brian DemetVero3 · Chief Executive Officer
  • Scott DurginVero3 · President and Director
  • Peter Harding-SmithVero3 · VP Finance and Director
  • Simon RienstraVero3 · VP Development
  • Richard CotteeVero3 · Specialist Advisor

Build on ground that's ready.

The digital age starts somewhere physical.

Site photography · Wyoming · August 2026