An independent developer of power-first AI campuses
The digital age starts somewhere physical.
Why we existWe believe the AI era should be built on ground that's ready for it: firm power, secured water, and alignment with the host community's needs.

Illustrative rendering
Why
Chips are scaling faster than the power they require.
Capacity that can't be energized can't earn. Progress shouldn't wait on the physical world, and closing the gap between planned compute and energized power is why GroundPoint exists.
How
One project. Interdependent decisions.
Land, engineering, power, and capital can be acquired separately. Then, each component runs on its own schedule, with the slowest one setting the pace. GroundPoint plans them as one project, starting with the power.
Four principles guide every project: start from the ground up; partner with those who have it; one project, one schedule; gates before construction.
Each part of a campus sets the limits of the others. Select one to trace the upstream drivers and downstream impacts.
Start with a credible energy position.
Gas, water, and pore space are assessed before the campus is designed so power is planned in, rather than waited on.
- First-phase size and timing
- Bridge and firm power
- Water and carbon approach
- Resource owners and rights
- Permits and interconnection
- The customer's load profile
Design the campus around the power.
Land, electrical, thermal, and water systems are sized to the energy position and the customer's required density.
- Building phasing
- Electrical and cooling architecture
- Water use
- The energy position
- The customer's basis of design
- Site and permitting conditions
Build to the customer's basis of design.
Density, cooling, redundancy, and phase timing needs are determined early, so power and buildings are sized correctly.
- Powered shell to turnkey scope
- Rack density and cooling
- Phase timing and lease terms
- Power available in each phase
- Room on the site to scale
- Financing for each phase
Commit capital as risks are retired.
Capital is committed at the project level as each development gate is cleared, and every phase is ring-fenced.
- When each phase is funded
- Project structures
- Construction start
- A signed long-term lease
- A power contract
- Permits and final investment decision
What
Power-first AI campuses, phased to a gigawatt and beyond.
For hyperscalers, neoclouds, and AI labs, from an independent, customer-neutral developer.
- Powered shell to turnkey solutions
Flexible deployment options ranging from permitted, powered building shells to fully fitted, move-in-ready data centers tailored to your IT specifications.
- Phased to scale
From hundreds of megawatts to multiple gigawatts, with all phases planned concurrently.
Flagship · in development
The first is in Wyoming.
The Wyoming campus is in development with Vero3.

- 500 MW
- First phase target, behind the meter
- 2029
- First large-scale power targeted, with bridge power before then
- 7.5 GW
- Campus pathway, phased
Targets and Sponsor estimates.
A reason to connect
Where do you start?
Compute demand, land and resources, technology, or capital: each has a direct path into a GroundPoint project.
Need capacity that can actually be powered?
From powered shells to turnkey data centers, phased and planned around your basis of design.
Discuss capacity Site ownersHave the resources AI campuses need?
Land with gas, water, or pore space. Sell, lease, contribute, or partner.
Explore your site Technology partnersCan your technology work at gigawatt scale?
Power, cooling, water, carbon capture, and digital controls, designed in from the start.
Explore a partnership Capital partnersLooking for development with discipline?
Project-level capital, committed as each development gate is cleared.
Discuss investmentExploratory conversations are not commitments to develop, finance, or deliver a project. Details shared under NDA.
Project team
Led from where energy meets hyperscale.
Founder-led, with an experienced project team on the ground in Wyoming. GroundPoint and Vero3 are developing the campus together, as one team.
- Eddie GanzinottiGroundPoint · Founder and Managing Partner
- Tim McManusVero3 · Founder and Director
- Brian DemetVero3 · Chief Executive Officer
- Scott DurginVero3 · President and Director
- Peter Harding-SmithVero3 · VP Finance and Director
- Simon RienstraVero3 · VP Development
- Richard CotteeVero3 · Specialist Advisor

Build on ground that's ready.
The digital age starts somewhere physical.
Site photography · Wyoming · August 2026