Wyoming: ground that's ready.

GroundPoint × Vero3 · in developmentA multi-gigawatt energy and resource campus: firm behind-the-meter power, water produced from deep brine, carbon storage, and lithium recovery on one site.

An existing power plant beside the Wyoming campus site, across open sagebrush high desert
Site photography · Wyoming · August 2026
First phase target, behind the meter
500 MW
First large-scale power targeted
2029
Campus pathway, phased
7.5 GW

Targets and Sponsor estimates.

Why this site

Everything a gigawatt-scale campus needs, already in the ground.

Power

Speed to power

More than 0.5 Bcf/d of gas indicated on site from three interstate pipelines.

Grid

Grid at the fence line

Next to an existing multi-gigawatt plant and 345 kV substation.

Carbon

Stored on site

Capture from Phase 2, about 3.75 Mt of CO₂ a year; Class VI permit targeted for 2028.

Water

Produced, not drawn

Water from deep brine, not local supply.

Land

Room to scale

16,300-acre platform.

Fiber

Connected

Three to four providers on the I-80 corridor; about 5 to 7 ms to Salt Lake City.

Where it stands

In development, with Vero3.

  1. 2026

    Co-development with Vero3

    GroundPoint and Vero3 are developing the campus together, as one project.

  2. Underway

    Engineering, permitting, and community engagement

    With letters of support from federal, state, and local stakeholders.

  3. Next

    Customer and financing

    Basis of design, lease, and final investment decision.

  4. Targeted 2029

    First large-scale power

    Bridge power first, then phased expansion.

Community

Built with Wyoming, not just in it.

The campus is planned around the questions communities ask first: who supports it, who pays for the power, and whose water is used.

Support

Support on record

Letters of support from federal, state, and local stakeholders, with community engagement underway alongside engineering and permitting.

Ratepayers

Power that pays its own way

Generation is built on site, behind the meter with a path to grid connection, so the campus is designed to grow without shifting its costs onto Wyoming ratepayers.

Water

Local water left alone

Water is produced from deep brine rather than drawn from local supply, with volumes being set during engineering.

“By integrating firm power generation, CO₂ utilization, deep aquifer desalination, and critical mineral recovery into a single turnkey platform, we deliver scale and speed without compromising local water security, grid stability, or Wyoming ratepayer interests.”
Eddie Ganzinotti, Founder and Managing Partner, GroundPoint

Project team

One team, one schedule.

GroundPoint leads customers, capital, and the data center campus. Vero3 leads power, water, carbon, and lithium. The campus is planned and delivered as one project.

GroundPoint · Founder and Managing PartnerEddie Ganzinotti

Leads customers, capital, and the data center campus. Former Vice President, Data Centers and New Energy, SLB, after senior roles across operations, commercial, and general management at SLB and Cameron. MBA, MIT Sloan.

Vero3 · Founder and DirectorTim McManus

30 years discovering, developing, and operating international projects, mostly in executive leadership roles across ASX-listed and private companies. MBA (Innovation); BSc (Geology); Certificate in Global Oil and Gas Management, University of Arizona.

Vero3 · Chief Executive OfficerBrian Demet

Geologist (MS, Rice University). At Stonewater Minerals, took a lithium-brine idea to a funded, permitted, operating asset, including 22,000 acres of leases and the county approvals. Runs development, permitting, land, and capital at Vero3.

Vero3 · President and DirectorScott Durgin

28 years at Peabody Energy, from Mine Engineer to Senior Vice President, Wyoming Operations, including VP Operations at the North Antelope Rochelle Mine. BS, Mining Engineering, and MS, Technical Management, South Dakota School of Mines.

Vero3 · VP Finance and DirectorPeter Harding-Smith

Chartered Accountant with more than 30 years in listed-company finance, governance, capital raising, IPOs, and M&A. Former CFO of ASX-listed Orbis Gold and Metro Mining. Fellow of the Governance Institute of Australia and the Financial Services Institute of Australasia.

Vero3 · VP DevelopmentSimon Rienstra

Civil engineer with 15 years across infrastructure, mining, and critical minerals, including John Holland and MCG Group, and General Manager, Projects at Bass Metals (Graphmada). Led the feasibility work and valuation models for the preliminary economic assessment.

Vero3 · Specialist Advisor · Energy and governanceRichard Cottee

Chairman of Elixir Energy since 2019. As Managing Director, took Queensland Gas Company from junior explorer to its A$5.7B acquisition by BG Group. Trained as a lawyer; former CEO of CS Energy, NRG Europe, Central Petroleum, and Nexus Energy.

GroundPoint and Vero3 are developing the Wyoming campus together under a co-development agreement.

Capacity in Wyoming, moving now.

Request the capacity brief under NDA.

Site photography · Wyoming · August 2026