Wyoming: ground that's ready.
GroundPoint × Vero3 · in developmentA multi-gigawatt energy and resource campus: firm behind-the-meter power, water produced from deep brine, carbon storage, and lithium recovery on one site.

- First phase target, behind the meter
- 500 MW
- First large-scale power targeted
- 2029
- Campus pathway, phased
- 7.5 GW
Targets and Sponsor estimates.
Why this site
Everything a gigawatt-scale campus needs, already in the ground.
Speed to power
More than 0.5 Bcf/d of gas indicated on site from three interstate pipelines.
Grid at the fence line
Next to an existing multi-gigawatt plant and 345 kV substation.
Stored on site
Capture from Phase 2, about 3.75 Mt of CO₂ a year; Class VI permit targeted for 2028.
Produced, not drawn
Water from deep brine, not local supply.
Room to scale
16,300-acre platform.
Connected
Three to four providers on the I-80 corridor; about 5 to 7 ms to Salt Lake City.
Where it stands
In development, with Vero3.
- 2026
Co-development with Vero3
GroundPoint and Vero3 are developing the campus together, as one project.
- Underway
Engineering, permitting, and community engagement
With letters of support from federal, state, and local stakeholders.
- Next
Customer and financing
Basis of design, lease, and final investment decision.
- Targeted 2029
First large-scale power
Bridge power first, then phased expansion.
Community
Built with Wyoming, not just in it.
The campus is planned around the questions communities ask first: who supports it, who pays for the power, and whose water is used.
Support on record
Letters of support from federal, state, and local stakeholders, with community engagement underway alongside engineering and permitting.
Power that pays its own way
Generation is built on site, behind the meter with a path to grid connection, so the campus is designed to grow without shifting its costs onto Wyoming ratepayers.
Local water left alone
Water is produced from deep brine rather than drawn from local supply, with volumes being set during engineering.
“By integrating firm power generation, CO₂ utilization, deep aquifer desalination, and critical mineral recovery into a single turnkey platform, we deliver scale and speed without compromising local water security, grid stability, or Wyoming ratepayer interests.”
Project team
One team, one schedule.
GroundPoint leads customers, capital, and the data center campus. Vero3 leads power, water, carbon, and lithium. The campus is planned and delivered as one project.
Leads customers, capital, and the data center campus. Former Vice President, Data Centers and New Energy, SLB, after senior roles across operations, commercial, and general management at SLB and Cameron. MBA, MIT Sloan.
30 years discovering, developing, and operating international projects, mostly in executive leadership roles across ASX-listed and private companies. MBA (Innovation); BSc (Geology); Certificate in Global Oil and Gas Management, University of Arizona.
Geologist (MS, Rice University). At Stonewater Minerals, took a lithium-brine idea to a funded, permitted, operating asset, including 22,000 acres of leases and the county approvals. Runs development, permitting, land, and capital at Vero3.
28 years at Peabody Energy, from Mine Engineer to Senior Vice President, Wyoming Operations, including VP Operations at the North Antelope Rochelle Mine. BS, Mining Engineering, and MS, Technical Management, South Dakota School of Mines.
Chartered Accountant with more than 30 years in listed-company finance, governance, capital raising, IPOs, and M&A. Former CFO of ASX-listed Orbis Gold and Metro Mining. Fellow of the Governance Institute of Australia and the Financial Services Institute of Australasia.
Civil engineer with 15 years across infrastructure, mining, and critical minerals, including John Holland and MCG Group, and General Manager, Projects at Bass Metals (Graphmada). Led the feasibility work and valuation models for the preliminary economic assessment.
Chairman of Elixir Energy since 2019. As Managing Director, took Queensland Gas Company from junior explorer to its A$5.7B acquisition by BG Group. Trained as a lawyer; former CEO of CS Energy, NRG Europe, Central Petroleum, and Nexus Energy.
GroundPoint and Vero3 are developing the Wyoming campus together under a co-development agreement.

Capacity in Wyoming, moving now.
Request the capacity brief under NDA.
Site photography · Wyoming · August 2026